Project Category: Renovation

[ess_grid alias="122-5th-avenue"][/ess_grid] 122 Fifth Avenue On our 122 5th Avenue project, the full-scale renovation seeks to modernize the historic building from the inside out. The gut renovation includes the full installation of new MEP systems and equipment, passenger elevators featuring touchless technology, brick masonry and precast stone...

There is not a more iconic building in New York than Hotel Chelsea on 222 West 23rd Street. Originally built between 1883-1885 (a couple of years before the Eiffel Tower was constructed) Hotel Chelsea reached NYC landmark status in 1966 and has been on the...

The Paramount Hotel is an excellent case study for Omnibuild’s infrastructure capabilities. The company was called upon to manage a Con ED and electrical upgrade, a grand lobby renovation, new cooling tower, generator and various air handling units installation, as well as the structural upgrades...

In perhaps the most logistically challenging project the company has taken on, Omnibuild was contracted to handle a full-gut interior renovation – including a pedestrian bridge extension – at New York City’s largest hotel. Located in the impossibly busy Time Square and abutting some of...

Omnibuild’s most challenging feat of engineering occurred in its renovation of the W hotel. The company was tasked with converting an antiquated and problematic PTAC system to individual water source heat pumps in each room, all while the hotel stayed open and occupied. Logistically the...

Omnibuild again showcased its ability to delicately handle large-scale renovations in its work on the Double Tree Times Square. The challenge was considerable – completely restore a three story lobby and hotel restaurant during the winter and fall seasons, while allowing the hotel to stay...

Omnibuild again showcased its ability to delicately handle large-scale renovations in its work on the DoubleTree Times Square. The challenge was considerable – completely restore a three story lobby and hotel restaurant during the winter and fall seasons, while allowing the hotel to stay fully...

When Mercy College decided to renovate and expand its library without disrupting student activities – meaning all construction would have to take place during the three-month summer break – it turned to Omnibuild for help. The tight schedule afforded no margin for error, but none...